MetEC
The Ethiopian PM blamed on August 25 METEC for the delay in the construction of the multi-billion dollar Grand Ethiopian Renaissance Dam according to The Reporter.
Ethiopian Prime Minister Abiy Ahmed blamed the military-based local contractor, MetEC, for the delay in the construction of the Grand Ethiopian Renaissance Dam
Most Read