CAIRO – 1 January 2021: Egypt’s President Abdel Fattah el Sisi inspected, Friday the pace of work at the Middle Ring Road as he praised ‘the achievement and dedication of the workers’ despite the ‘exceptional circumstances and precautionary measures of coronavirus.’
Presidential Spokesman Bassam Radi said in a statement that the 156 km Middle Ring Road project extends from the city of Belbeis in the Sharqia governorate to the Dabaa corridor.
The Middle Ring Road is located in the southern area between Greater Cairo’s Ring Road and the Regional Ring Road serving all governorates of Upper Egypt, Nile Delta, and Canal cities, as well as the new cities on both sides of the road in the east and west of Cairo.
Sisi also inspected the development process of El Matariyyah district and Mohamed el Assar road axis.
He was briefed on the executive situation of the construction, stressing the importance of finalizing the projects as per the timetable set for the completion of the construction works, as well as implementing the anti-coronavirus measures.
Sisi tweeted later praising the workers devotion saying: “Today, I followed the progress of work at the Middle Ring Road, which represents a great addition to the road network system.”
Sisi added: “I was pleased with the achievement and dedication of the workers, who carry out their work in the midst of exceptional circumstances, due to coronavirus. “
تابعت اليوم سير العمل ومعدلات الإنجاز بجميع قطاعات الطريق الدائري الأوسطي، والذي يمثل إضافة كبيرة لمنظومة شبكة الطرق ونقلة نوعية في الحركة المرورية.
— Abdelfattah Elsisi (@AlsisiOfficial) January 1, 2021
١/٢ pic.twitter.com/26B33d5cmK
Comments
Leave a Comment